
This operation took three guys (two at minimum I figure) -- one cranking the hoist and the others at the ends pushing it into position. The column tops were strapped with specially fitted wood blocks to collar the beam. A couple of 2x4 extenders were tacked from existing tail rafters to the nailer strip on the beam. It's stable for the time being unless there's an earthquake.
Next: getting a good welder to make some pretty welds.

No comments:
Post a Comment