Dec 3, 2007

Underlayment

Removed terrazzo tile at Entry hall, added 1 1/8" and 3/4" plywood (1 13/16" combined) using deck screws and some screw-shank nails matching adjacent floor level as close as possible, laid 5mm luan plywood using adhesive and staples (1/4" combined) in Bedroom 4 and PowdRm.Minor differences in floor level will have to be shimmed up with cardboard and sanded down to match (therefore plywood better than OSB). Combined cost = $305.

No comments: