The side facade needed a consistent color across old and new, so before getting blocked by the new stairs/landing, I applied two coats of paint over masonry primer to the area. The rest can be done later.

A code-compliant landing, stairs and guardrail have to be in place before the framing sign-off, which precedes
sheetrock, and I'm really anxious to get the interior covered up. It's been a slow progression.