Wiring for the underfloor lights (the concrete ground, a.k.a. "rat slab," makes it suitable for storage) had to go in before the floor insulation, which is my next inspection prior to the final. It's been almost 180 days since my last inspection, so I have to do it now or else apply in person for a time extension. Or the permit expires.