Powder room
Suntunnel (see
how it looks on the roof) is now roughed in, ceiling drywall fastened, and rigid insulation pressed between flat studs against brick veneer.
Blocking for future grab bars are positioned about 33 inches from the floor, on the left side wall and chamfer corner wall only.
No comments:
Post a Comment