By far the most aggravating part of remodeling is dealing with a sluggish pseudo-service organization like PG&E. The monopolized utility does not try to win your business on a personal level, provide any prompt attention if you don't have an emergency, nor offer any accountability for their delays. As a customer you have absolutely no recourse.
I'm not sure anymore if it helped having submitted their application for upgrade as early as November 2006. That's eight months ago!
The main panel is now caulked, painted and as finished as it can ever be. It's even signed off by the county building inspector. Click on an image to see the previous post.
There's just a huge hole in the roof with the two weatherheads. They have to disconnect and reconnect before I can cut off the old one. My makeshift plastic was the only protection from those surprising July showers.
I should be glad this is in the middle of an otherwise dry summer.