Electrician advised installing two ground rods and appropriate connections at all plumbing pipes to satisfy municipal codes. These are ten feet long to be driven their full lengths, but I have extremely hard soil at three feet! The one on the left is as much as it'll go with manual hammering. I'll need to rent a breaker hammer (to be used without the breaker bit).
No comments:
Post a Comment