While the team of five amigos rushed through the framing of the addition, I completed all the interior walls. My studs are kiln-dried and mostly nonstructural as they define the walk-in closet and laundry areas. I only had to get that outermost wall built before they took down the old exterior wall (replaced by the reddish 4x16 LVL visible at top left). It was temporary shoring of the existing ceiling joists and rafters.