Feb 5, 2007

Added sewer cleanout


Covered with a round box and cap that reads, "irrigation control valve," the cleanout plug and riser are ABS, the Y cast iron, while the existing 4-inch pipe is Transite. All connections were made with rubber boots and pipe clamps.

This is needed because the spot where the existing sewer cleanout is located will become the underfloor crawl space of the addition.

No comments: